|
I started this job in March for my wife. She wanted a jacuzzi tub and we also needed the
bathroom done over. I removed the pocket door dividing the orginal bathroom, this helped to create more room required
by the larger tub. Along with the tub, I will be installing an antique style toilet and pedestal sink. Beaded
wanescoating will be installed on walls and jacuzzi frame and painted white. Ceramic tile will be installed on the floor
and around the tub. A new 4 ft. section of hot water baseboard heat was installed due to the new configuration of the
room. Apx. time of completion, 7 days.
|