The garage was only a part of the entire project.  We also built a master bath, two walk-in closets, laundry room, installed interior french doors and enclosed an outside porch and turned it into a den.  Total construction time:  6 weeks.

Building the walls
mvc-002f.jpg

Ready for the special order shingles
mvc-004f.jpg

Were done
mvc-006fv.jpg

Return to Residential Projects

We designed and built trusses for the roof
mvc-003f.jpg

Starting the vinyl siding
mvc-005f.jpg

Built wall and installed french doors
mvc-007f.jpg